SCH Number 2019120478


Project Info

Title
Residual Control System Pilot Project
Description
The project is a temporary pilot project that consists of the installation of a residual control system (RCS) at an existing water distribution site (O.D. Arnold Tank Site). The RCS will be installed in an existing paved area within the tank site and adjacent to the tank. As part of the project, information will be collected.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Sweetwater Authority Sweetwater Authority (SWA) - Residual Control System Pilot Project (Project)
Sweetwater Authority Residual Control System Pilot Project