SCH Number 2019119026


Project Info

Title
Davenport Park Expansion Project
Description
The project would expand the existing 5.5-acre Davenport Park by approximately 6 acres, for total park size of approximately 11.5 acres. The City is proposing to expand Davenport Park in an effort to meet the City's General Plan Open Space (2002) goal of providing 8 acres of recreational open space for every 1,000 residents. The planned park expansion would include a sports field located on the central and western portion of the site, four sets of three-level bleachers on each side of the sports field, six fitness equipment pads scattered around the site (future phase), a 5,000-square-foot (sf) skate park (future phase), a shaded gathering area, and 31 diagonal parking spaces along the northern boundary of the site on. the northern boundary of the site on East 55th Way. A portion of the existing parking lot would be re-designed as a school bus drop-off location.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Long Beach Mitigated Negative Declaration (MND14-19) for the Davenport Park Expansion Project
City of Long Beach Davenport Park Expansion Project