SCH Number 2019109080
Project Info
- Title
- Guadelupe Channel Erosion Control Project
- Description
- The proposed project includes bank stabilization and erosion-control improvements to the open channel portions of Guadalupe Channel in the City of Brisbane. These improvements would protect approximately 400 linear feet of watercourse channel between a culvert beneath the Bayshore Boulevard/Valley Drive intersection and the Machinery Road bridge structure immediately south of the Brisbane Fire Department Station. The purpose of this project is to prevent vegetation falling into the Guadalupe Channel, which could obstruct flow and expose slopes to erosion.
2 documents in project