SCH Number 2019099101
Project Info
- Title
- SR-99 Corridor Bikeway Facility Phase 5 20th Street Overcrossing (Bikeway 99 Phase 5) (Project)
- Description
- The City of Chico (City), in cooperation with the California Department of Transportation (Caltrans), proposes to construct a Class I bikeway street overcrossing above East 20th Street, while establishing a bikeway gap closure along the east side of SR 99 corridor. The Project is located in Township 22 North, Range 1 East in the City of Chico, within Butte County, California (Figure 1. Project Vicinity, Figure 2. Project Location). The completed Bikeway 99 Corridor will serve as a continuous alternative transportation and recreational route from Eaton Road to Skyway, spanning nearly 7 miles. The current lack of a safe and direct pedestrian/bike path discourages residents from walking or biking to local schools, job centers, commercial areas, and public services. This Project will connect people to goods and services including the Chico Mall. The bikeway overcrossing would provide a link to both sides of East 20th Street and Business Lane, offering access to local restaurants and businesses (Figure 3. Project Features). The bikeway would enhance the safety of pedestrians and bicyclists by creating a route that is separate from traffic congestion on East 20th Street. Additional safety features of the path include lighting, security cameras and the removal of thick vegetation in order to increase visibility on the bikeway. The ramp structure will include the installment of lighting, fencing, and/or the use of other techniques (i.e., physical barriers) to discourage graffiti and loitering. The design of the bridge, as selected through an extensive public outreach effort, is intended to incorporate the history, culture and overall atmosphere of Chico. See NOC for Full Details.
3 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | City of Chico | State Route 99 Corridor Bikeway - Phase 5 Project | |
NOD | City of Chico | SR-99 Corridor Bikeway Facility Phase 5 20th Street Overcrossing (Bikeway 99 Phase 5 - Capital Project # 50347) | |
MND | City of Chico | SR-99 Corridor Bikeway Facility Phase 5 20th Street Overcrossing (Bikeway 99 Phase 5) (Project) |