SCH Number 2019098021
Project Info
- Title
- Advanced Steel Recovery Removal Action Workplan
- Description
- The project involves the installation of a concrete cover, Operation and Maintenance (O&M) Pian to maintain the integrity of the cover, and preparation of a land use covenant (LUC) to restrict future site use for the Advanced Steel Recovery (ASR Project Site). The Cleanup Decision Document, referred to as a Removal Action Workplan (RAW) concluded that the contaminated soil with metals and polychlorlnated biphenyls (PCBs) could be addressed by the installation of a concrete cover, Operation and Maintenance (O&M) Plan to maintain the integrity of the cover, and preparation o~ a land use covenant (LUC) to restrict future land use development.
1 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOE | California Department of Toxic Substances Control (DTSC) | Advanced Steel Recovery Removal Action Workplan |