SCH Number 2019098021


Project Info

Title
Advanced Steel Recovery Removal Action Workplan
Description
The project involves the installation of a concrete cover, Operation and Maintenance (O&M) Pian to maintain the integrity of the cover, and preparation of a land use covenant (LUC) to restrict future site use for the Advanced Steel Recovery (ASR Project Site). The Cleanup Decision Document, referred to as a Removal Action Workplan (RAW) concluded that the contaminated soil with metals and polychlorlnated biphenyls (PCBs) could be addressed by the installation of a concrete cover, Operation and Maintenance (O&M) Plan to maintain the integrity of the cover, and preparation o~ a land use covenant (LUC) to restrict future land use development.
Download CSV New Search

 

1 documents in project

Type Lead/Public Agency Received Title
Department of Toxic Substances Control Advanced Steel Recovery Removal Action Workplan