SCH Number 2019089113
Project Info
- Title
- Redwood Valley Water Infrastructure Retrofit Project
- Description
- The project replaces water mains in portions of the Redwood Valley County Water District to provide seismic resiliency. Additional new water mains would be installed to intertie with existing and replacement mains to provide water distribution system resiliency. The project includes new meter replacements to facilitate residential fire sprinkler systems as well as flush-out valves to improve distribution system water quality and facilitate future installation of fire hydrants.
2 documents in project