SCE Eldordo-Lugo-Mohave Project (ELM Project)
Description
Southern Calfornia Edison's application to construct the Eldorado-Lugo-Mohave Series Capacitor Project, which would include the following components: (1) construction of two new 500 kV mid-line series capacitors north of 1-40 in the vicinity of Pisgah, including distribution and telecommunication lines to the two sites (2) relocation, modification, or replacement of existing transmission, subtransmission, and distribution facilities at 12 locations to address 14 potential overhead clearance discrepancies (3) replacement of 235 miles of existing overhead ground wire (OHGW) on the Lugo-Mohave and Eldorado-Mohave transmission lines with new overhead optical ground wire (OPGW), (4) construction of three new optical repeater facilities on the existing Lugo-Mohave transmission right-of-way to support the new OPGW, (5) modification or replacement of equipment within the existing Eldorado, Lugo, and Mohave Substations. Construction of Proposed Project is expected to last 20 months.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
California Public Utilities Commission (CPUC) Eldorado-Lugo-Mohave Series Capacitor Project (Streambed Alteration Agreement 1600-2019-0001- R6)
California Public Utilities Commission (CPUC) SCE Eldorado-Lugo-Mohave Project (ELM Project)
California Public Utilities Commission (CPUC) SCE Eldordo-Lugo-Mohave Project (ELM Project)