SCH Number 2019069077
Project Info
- Title
- Maintenance District No. 8A North Fork Water System Improvements
- Description
- The improvements include the following: 1) construction of water piping along CR 225 and 228 and metered service connections for Bass Lake Mobile Home Park, John Hovannisian Water System, Buckhorn Saloon/Restaurant, North Fork ES, and the North Fork CDC; 2) construction of water piping within North Fork ES; 3) construction of a deeper annular seal, reconstruction of the well head, replacement of the pump and motor, installation of new electrical and control equipment, and disinfection of the Pizza Well; 4) equipping of Well No.2; 5) construction of a storage and booster pumping facility; 6) construction of a centralized treatment facility; 7) construction of raw water piping from Well No.1, Well No.2, and the Pizza Well to the centralized treatment facility; and 8) modifications to the existing MD-8A storage tank inlet/outlet piping.
2 documents in project