SCH Number 2019069056


Project Info

Title
Summer Hill Water System Improvement Project
Description
The Project will involve improving most of the County Service Area Number 16 Surface Water Treatment Plant infrastructure. Improvements include replacing existing treatment filters with two 175- Gallon Per Minute (GPM) packaged water systems, replacing storage Tank Number 1 with a new tank, increasing the capacity ofTank Number 2 to 135,000 gallons, and installing a solids handling system and two backwash reclaim tanks. Additional improvements include relocating the chlorine injection point, installing internal flow baffles in storage Tank Number 2, installing a corrosion inhibitor chemical feed system, installing a Supervisory Control and Data Acquisition system, and upgrading the treated water booster pump station. These improvements will help the County reliably supply the maximum daily demand of 218 GPM and meet required flows for fire protection.
Download CSV New Search

 

4 documents in project

Type Lead/Public Agency Received Title
Madera County Sumner Hill Water System Improvement Project
Madera County Sumner Hill Water System Improvement Proeject
Madera County Sumner Hill Water System Improvement Project
Madera County Summer Hill Water System Improvement Project