SCH Number 2019069010
Project Info
- Title
- El Capitan State Beach
- Description
- On Cabrillo Group Camp, the Sewer Lift Station #8 is servicing Combination Building #8 in addition to two service sinks. Besides mechanical problems associated with exceeding expected life, the lift station is located along a coast cliff face that has been eroding for years. The potential for environmental damage due to raw effluent emitted from a mechanical break or slope failure is high. Such a failure would result in the State Beach closing down until repairs are complete. The purpose of this project is to replace and relocate Lift Station #8 to address potentially significant environmental damages due to the current mechanical issues of the lift station #8 and damages/closures from anticipated cliff erosion.
2 documents in project