SCH Number 2019068097
Project Info
- Title
- Downtown Turlock PCE Project
- Description
- The City has applied for a planning grant through the State Water Resources Control Board to conduct some investigative work on PCE within the City. The grant will provide funding several phases of subsurface site assessments. Each phase includes the penetration of the ground surface with small holes ranging from 1 /2 to 8..;inches in diameter, depending on technique: passive, active soil gas, direct push or borings. Borings will be drilled to install long term monitoring wells. All ground penetrations will be located in areas ranging from public right of ways (i.e. city streets and curb lines), landscaping areas, and parking areas, or as needed on private property with the agreement of the land owner. All locations will be pre-approved t>y the City and the Regional Water Quality Control Board. The monitoring wells could be in place for the fife of the project which is anticipated to be 20 years.
1 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOE | City of Turlock | Downtown Turlock PCE Project |