SCH Number 2019068044


Project Info

Title
Operation of Big B Travel Center 2 - Well 3 (Replacement to Well 2) Project (Project)
Description
Big B Travel Center 2 will drill a 40 to 55 gallon per minute well 1 Well 3, to replace Well 2, a 50 gallon per minute well. The well will be installed on a 25-foot^2 pad. Approximately 600~feet of less than 3-inch piping will be installed to connect the well to the building and for discharge piping. The· Project will provide for the operation of the facilities.
Download CSV New Search

 

1 documents in project

Type Lead/Public Agency Received Title
State Water Resources Control Board Operation of Big B Travel Center 2 - Well 3 (Replacement to Well 2) Project (Project)