SCH Number 2019059005
Project Info
- Title
- John Anson Ford Park (JAFP) Infiltration Cistern Project to Capture Urban Runoff
- Description
- The project would capture, retain, infiltrate, and replenish urban runoff by Installing a stormwater capture and subsurface Infiltration system at JAFP. The project would construct a diversion structure and subsurface infiltration basin below JAFP to capture and recharge up to 1,200 acre-feet per year of dry-weather and storm runoff from a catchment area of 2,295 acres. The project would divert stormflows from an existing stormwater drainage system, Install a water treatment facility beneath the northerly parking lot at JAFP, and construct bottomless cisterns beneath the existing baseball field and soccer field. The project would be Implemented in three phases. For each phase of the project, the staging of construction equipment and materials would occur on disturbed areas, Including but not limited to the northern parking area.
2 documents in project