SCH Number 2019049148
Project Info
- Title
- Wastewater Collectioin System Upgrade
- Description
- The CSD has proposed sewer line improvements that will address aging infrastructure and prevent unsanitary conditions for the Community and surrounding area (Project). The improvements to the sewer line consist of a combination between the Traditional Method and the Trenchless Methods such as pipe bursting or cured-in-place pipe. Possibly all segments may require replacement or repair, but it is anticipated that only specific segments of the network will need replacement. Most of the repair is anticipated to occur in-ground, which does not necessitate excavation. These portions will be abandoned in-place and capped at both ends, with new pipe installed parallel to the existing pipelines.
2 documents in project