SCH Number 2019049083


Project Info

Title
Doolin Creek Bank Repair Project
Description
Note: Review Per Lead The Project consists of re pairing approximately 75 feet of stream bank on Doolin Creek to prevent damage to the supports of an existing residential deck. According to the applicant, significant storm events from the 2016-17 winter season caused the bank to erode, threatening to undermine the existing deck by exposing the deck supports. The Project would include: 1) the installation of jute netting to cover the bank during the winter to provide temporary protection; and 2) the installation of a bioengineered crib wall with minor rip rap, encapsulated soil lifts, log cribbing and revegetation. The total area of disturbance is approximately 353 square feet, including a crib wall 45 feet in length, 4 feet in width and 6 feet in height. Construction is anticipated to take approximately two weeks.
Download CSV New Search

 

2 documents in project

Type Lead Agency Received Title
City of Ukiah Doolin Creek Bank Repair Project
City of Ukiah Doolin Creek Bank Repair Project

Disclaimer: Summaries of the notices may take several days to appear on CEQAnet. Again, the publishing of information on CEQAnet does not factor into when such notices were received and posted by the SCH. Contact the SCH for copies of an NOE or NOD that has been posted at OPR.