SCH Number 2019012036
Project Info
- Title
- McCune-Midway Recovery Facility Project
- Description
- The project will construct a turnout structure in the east bank of McCune Creek channel, immediately south of the Midway Road Bridge. The turnout structure will be connected to a low lift pump station that will connect and supply water to the District's existing Weynard Lateral 1-G and Lateral 4 Systems. In addition, 3,950 ft of pipe will be installed from the turnout structure east to Batavia Road into an existing water line.
2 documents in project