SCH Number 2019011022


Project Info

Title
I-5 Freight Corridor Project
Description
FYI: Final Caltrans is proposing a Freight Corridor Improvement Project (Project) along 1-5 in Los Angeles County from SR-134 (Postmile 27.0) to Templin Highway Undercrossing (Postmile R67.0) by increasing the vertical clearance to 16 ' -6 " and eliminating load capacity restrictions for heavy loads. The proposed project will increase vertical clearance at Roscoe Blvd. Overcrossing (OC), Sunland Blvd. OC, Olinda St. Pedestrian Overcrossing (POC), Tuxford Off-ramp OC, Lankershim Blvd. OC, Peoria St. OC, Laurel Canyon Blvd. OC, and Sheldon St. OC. This will be accomplished by replacing the bridges and raising the bridge profiles by approximately 1 to 2 feet at the Overcrossings and about 4 feet at Olinda St. POC. The proposed project will also eliminate the load capacity restrictions for heavy loads at the Los Angeles River Bridge and Separation by repairing the steel girders and un-staggering the steel cross frames, and at Templin Highway Undercrossing by replacing the Templin Highway Undercrossing bridges.
Download CSV New Search

 

4 documents in project

Type Lead/Public Agency Received Title
California Department of Transportation, District 7 (DOT) I-5 Freight Corridor Project
California Department of Transportation, District 7 I-5 Freight Corridor Project
California Department of Transportation, District 7 I-5 Freight Corridor Project
California Department of Transportation, District 7 I-5 Freight Corridor Project