SCH Number 2018101066
Project Info
- Title
- Reservoir 3A Replacement Project
- Description
- CVWD's existing 0.98-MG water storage Reservoir 3A has reached the end of its useful service life and will be replaced in three phases by two new reservoirs. The initial phase is the construction of a new 0.25 MG steel tank. In the second phase, after the construction and implementation of the 0.25 MG tank, the existing 0.98 MG concrete reservoir is to be demolished. In the final phase, a new 1.2 MG reservoir will be constructed over the existing footprint of the previous 0.98 MG reservoir.
2 documents in project