7th Standard Pipeline Project
Description
Construction activities would include installing approx 12 mi of buried pipe, up to 36 inches in diameter, along a max construction corridor width of 50 ft. Pipes would be installed by excavating open trenches. For pipes less than 24 inches in diameter, trenches would be 3 ft wide and 5 ft deep; for pipes greater than 24 inches in diameter, trenches would be 5 ft wide and 6 ft deep. Lateral pipes 18-24 inches in diameter would be installed to connect 18 turnouts to the 7th Standard Pipeline.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Buena Vista Water Storage District Addendum No. 2 to the Mitigated Negative Declaration for the 7th Standard Pipeline Project
Buena Vista Water Storage District 7th Standard Pipeline Project