SCH Number 2018088577


Project Info

Title
Port of Stockton Dock 12/13 Rehabilitation Project
Description
The CDFW has executed Lake of Streambed Alteration Agreement No. 1600-2018-0172-R3, pursuant to Section 1602 of the Fish and Game Code to Port of Stockton. The project is limited to replacement and reconstruction of the existing wooden decking supported by a combination of wood piles and concrete dolphins. The project would reconstruct the existing dock with steel support piles and concrete and steel grated decking. A total of 94 piles will be permanently installed (three(3) 96-inch diameter steel piles, 24 20-inch diameter steel piles, and 67 14x73 steel H piles) over a total area of approx. 236 square feet.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Port of Stockton Port of Stockton Dock 12/13 Repair and Reconstruction Project (Lake of Streambed Alteration Agreement No. 1600-2018-0172-R3)
Port of Stockton Port of Stockton Dock 12/13 Rehabilitation Project