SCH Number 2018022047


Project Info

Title
Buchanan Field Airpoprt Business Park
Description
The purpose of the project is to provide needed commercial office/warehouse/distribution space at Buchanan Field Airport. The Project site has a General Plan designation of Business Park and is zoned Unrestricted. The applicant (Montecito Commercial Group, LLC) proposes constructing a 52,000 sq. ft. slab on grade single story metal and concrete tilt up office/warehouse/distribution building. The building as it is proposed contains 22 individual units. Each unit will have a separate entrance at the front and rear of the building. The overall building measures 288 lineal feet by 391 lineal feet and will reach up to 37 feet in elevation. The project site is divided into two areas. Area A will be leased by the applicant and consists of 130,096 sq. ft. of net leasable acreage in compliance with the County General Plan Amendment dated June 21, 2016. Area A will be developed with the proposed 52,000 sq. ft. building and parking area. Area B will not be leased to the applicant. This area will be improved and maintained by the applicant with landscaping and new airport signage as part of their agreement with the Airport. A new monument sign on Sall Ride Drive around the entrance to the project location will be constructed of stucco, wood and concrete. Circulation of the parcel will allow delivery vehicles to load and unload at the front or rear of the building. landscaping will be included to soften the commercial nature of the project. All onsite parking, signage, landscaping, drainage, and lighting will conform to applicable codes and County standards. All electrical service will be supplied by an existing PG&E pole located on the parcel. Sewer service will be provided by Central Contra Costa Sanitary District. Water service will be provided by Contra Costa Water District. Contra Costa Fire Protection District will serve the property and Contra Costa Sheriff will provide emergency services. In addition, Buchanan Field also has on-site Aircraft Rescue and Fire Fighting equipment and staff. Construction is tentatively slated to commence in June of 2018 and be completed by Dec. of 2018.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Contra Costa County Buchanan Field Airpoprt Business Park
Contra Costa County Buchanan Field Airpoprt Business Park