SCH Number 2017124001


Project Info

Title
Westminster East Garden Grove Study
Description
The project identifies the federal interest in flood risk management within the Westminster watershed. The No Action Alternative along with two Action Alternatives were carried forward for analysis. The Recommended Plan is the Maximum Channel Modifications Plan, which includes implementing the maximum channel modifications in individual reaches of C02 (Bolsa Chica Channel), C04 (Westminster Channel), C05 (East Garden Grove-Wintersburg Channel), and C06 (Ocean View Chanel). The Recommended Plan also includes increasing the span of Warner Avenue Bridge and removing the tide gates on C05 Reach 1 and replacing with an access bridge. Compatible nonstructural measures would be incorporated to lessen the life safety risk associated with flooding in the project area.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
United States Army, Army Corps of Engineers (USACE) Westminster East Garden Grove Study
United States Army, Army Corps of Engineers (USACE) Westminster East Garden Grove Study
United States Army, Army Corps of Engineers (USACE) Westminster East Garden Grove Study