SCH Number 2017121078


Project Info

Title
Big Rock Cluster Solar Farms
Description
Note: Review Per Lead Project involves the construction of a 325-megawatt photovoltaic solar energy facility with an integrated battery storage system on approx. 1396 acres of land. The project would include a ground mounted PV solar power generating system, supporting structures, electronic/electrical equipment, on-site substation, retention basins, access roads, and fencing. The energy produced by the project would be conducted through a proposed 230 kV generator intertie line and delivered to the IID through a short interconnection with the proposed IID 230kV Fern Substation.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
Imperial County Laurel Cluster Solar Farms
Imperial County Big Rock Cluster Solar Farms
Imperial County Big Rock Cluster Solar Project