- Title
- Cottonwood Interim Basin Project
- Description
- The Cottonwood Interim Basin Project would construct a sedimentation basin to protect life and property by reducing downstream flooding due to sedimentation and debris build-up. The basin would measure approx 130 ft by 270 ft and would generally have 3 to 1 slopes. The basin inlet would align with the existing channel on the north side of the basin and include rip rap to protect the basin from erosion during storm events. An outlet concrete structure would be built at the southern end of the basin and connect to the existing 36 inch corrugated metal pipe located beneath Cottonwood Ave.