SCH Number 2017101004
Project Info
- Title
- Initial Study/Mitigated Negative Declaration for Oakhurst Midtown Connector
- Description
- The proposed Project will include construction of a new, two-lane road (Midtown Connector) connecting SR 41 on the northwest with Indian Springs Road on the southeast. The new road will include a bridge approximately 365 feet in length. The roadway will include 12-foot wide travel lanes; five-foot wide shoulders; a five-foot wide sidewalk; and separate, five-foot wide bike lane on either side of the road. The Project will also include intersection improvements at SR 41 and Midtown Connector, including installation of a traffic signal, as well as widening of SR 41 from two to four travel lanes for a distance of 1,742 feet. The Project will include improvements at the intersection of Road 427 (High School Road) and Indian Springs Road, including installation of a three-way signal and two left-turn lanes on Road 427.
4 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | Madera County | Oakhurst Midtown Connector Project | |
NOD | Madera County | County of Madera Oakhurst Midtown Connector | |
MND | Madera County | Initial Study/Mitigated Negative Declaration for Oakhurst Midtown Connector | |
MND | Madera County | Initial Study/Mitigated Negative Declaration for Oakhurst Midtown Connector |