SCH Number 2017051005
Project Info
- Title
- Brea Boulevard Corridor Improvement Project
- Description
- The Project involves widening Brea Boulevard from two to four lanes (two lanes each direction) between Canyondale Drive and the northern end of the corridor (approximately 1.5 miles), replacing and widening three functionally obsolete bridges, installing traffic signals approximately 1,200 feet north of Canyon Country Road and at the intersection of Brea Boulevard and Tonner Canyon Road, replacing the existing signal at Canyon Country Road, modifying existing driveway ingress/egress, installing a new wildlife overpass/land bridge, adding open graded asphalt concrete paving at the southern end of the corridor, and providing striping and installing new signage.
3 documents in project