SCH Number 2017042061
Project Info
- Title
- Orestimba Recharge Project
- Description
- The proposed project will construct a 20 acre recharge facility near Orestimba Creek and the Delta-Mendota Canal (DMC) that would allow the recharge of 500 acre feet per year (afy) to the local groundwater basin. Existing connections to the DMC would deliver up to 500 afy of excess winter flows and recaptured storm water flows. The banked water would be available for recovery during dry periods through the construction of an extraction well at the storm water flow from the King and San Joaquin Rivers.
2 documents in project