SCH Number 2017042003
Project Info
- Title
- Black Butte Bank Erosion Repair Project
- Description
- Project is limited to placement of rock rip-rap revetment along the basin slopes for erosion protection. Approx. 320 feet of new rip-rap would be placed on the north bank and approx. 350 feet of new rip-rap would be placed on the south bank.
3 documents in project