Lee Vining ADA
Description
This 201.361 project proposes to remove and replace non-compliant pedestrian facilities (curb ramps, sidewalks, and driveway openings) within the defined limits of the project. Conform work at the back side of sidewalk at driveways will require temporary construction easements. Drainage inlets located within the pedestrian pathway will be relocated. Proposed construction staging area is the Lee Vining Maintenannce Station. Temporary construction easements will be needed at back of reconstructed sidewalks, driveway openings, and ramps. Drainage work will consist of relocating drainage inlets in the street storm drain system with 4' trenching. A culvert will also be abandoned at Post Mile 51.25.