SCH Number 2016108240
Project Info
- Title
- Inflow and infiltration Reduction Project - Phase 5
- Description
- The project includes repair and maintenance activities (approx 26,000 lf of pipe replacement, 40,000 lf of pipe lining, 40 manhole repairs, and 750 sewer cleanout repairs) within the public ROW, with no capacity expansion. Extensive lining of existing (predominantly VCP) sewer mains to reduce inflow and infiltration. Extensive lining of existing leaking manholes. Spot repairs at sewer main offsets or breaks prior to lining. Replacement of damaged or sagging sections of sewer mains. Replacement of damaged lower sewer laterals. The installation of new sewer cleanouts where none exist on lower laterals. The installation of new manholes, and camera work to locate needed repairs and verify corrections.
2 documents in project