SCH Number 2016051071


Project Info

Title
Link Union Station
Description
The Link US Project is proposed to address existing capacity constraints at Los Angeles Union Station (LAUS). The Project consists of transforming LAUS from a stub end tracks station into a run-through tracks station by extending ten platform tracks south of LAUS Platforms 2 through 6 that would merge into a minimum of four tracks on the US-101 viaduct and continue south to connect to mainline tracks along the west bank of the Los Angeles River, the replacement of the existing pedestrian passageway under the platforms and tracks with a new expanded passageway, and 10 new run-through tracks for regional/intercity trains south of LAUS. The Project also includes off-site railroad improvements to BNSF Railway's Malabar Yard in the City of Vernon.
Download CSV New Search

 

5 documents in project

Type Lead/Public Agency Received Title
Los Angeles County Metropolitan Transportation Authority (LSCMTA) Link Union Station
City of Los Angeles Link Union Station Project
Metropolitan Transportation Authority Link Union Station
Metropolitan Transportation Authority Link Union Station
Metropolitan Transportation Authority Link Union Station (Link US)