SCH Number 2016031096
Project Info
- Title
- Final Third Revised Interim Measures Workplan, Ducommun AeroStructures, El Mirage Facility, California
- Description
- Pursuant to Ch. 6.5 of the Health and Safety Code, the DTSC has approved the proposed Project to controlt he migration of contaminated groundwater at the Ducommun AeroStructures, El Mirage facility (formerly known as Aerochem). The project proposes to conduct groundwater extraction activities to achieve hydraulic control, reduce the source of contamination through soil vapor extraction, augment and increase monitoring of the existing groundwater system. Historical activities at the Site have resulted in the release of trichloroethene (TCE), tetrachloroethene (PCE) and some metals, specifically hexavalent chromium, to soil and groundwater. The project activities would be conducted in accordance with the Final Third Revised Interim Measures Workplan, El Mirage Facility El Mirage, CA, dated Oct. 14, 2005 and Revised Sept. 2010.
2 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | California Department of Toxic Substances Control (DTSC) | Final Third Revised Interim Measures Workplan, Ducommun AeroStructures, El Mirage Facility | |
NEG | California Department of Toxic Substances Control (DTSC) | Final Third Revised Interim Measures Workplan, Ducommun AeroStructures, El Mirage Facility, California |