SCH Number 2016012032
Project Info
- Title
- Manteca WQCF Alternative Energy Programs Project
- Description
- Approval of three alternative energy program at its WQCF, which are a solar (photovoltaic) array, a biogas/CNG refueling station (with a truck refueling expansion area), and a food waste receiving facility. These programs were not included in the original WQCF Master Plan Update, and were therefore not analyzed within the associated WQCF Masters Plan EIR (EDAW, 2007). Additionally, as shown in Figure 3, an on-site soil excavation source area for the proposed project would be located adjacent to and to the north of the biogas/CNG refueling station and truck refueling expansion area. This soil excavation source area is considered a potential source for extra soil needs.
2 documents in project