SCH Number 2015111072


Project Info

Title
Well 33 Solar Photovoltaic Electric Generating System Project
Description
Development of the proposed well 33 site solar facility (Solar Photovoltaic: Electric Generating System Project) will consist of clearing and grubbing of vegetation from this existing highly disturbed open area; selected surface grading will occur on the approximate 6.5 acre area to support the future solar panels and support equipment; and installation of the solar panels and support equipment as described in more detail in the following text. The District is working with a commercial vendor, SunPower, to install the proposed solar project. The specific layout of this facility may be modified in the future as actual development occurs, but the proposed project will remain within the footprint and this whole facility site will be ultimately utilized. The District will provide minimal, downward facing, security lighting for the solar field.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Mission Springs Water District Mission Springs Water District Well 33 Solar Photovoltaic Electric Generating System Project
Mission Springs Water District Well 33 Solar Photovoltaic Electric Generating System Project