SCH Number 2015101062


Project Info

Title
Lateral 8 Regulating Reservoir Expansion Project
Description
TID proposes to expand the size of its existing Lateral 8 Regulating Reservoir facility to utilize the entire extent of the parcel on which it is located, to increase storage capacity of the existing surface water storage/regulation facility. As part of the expansion, two additional pumps will be installed at the existing pump facility. As with the existing regulating reservoir facility, the expanded regulating reservoir will receive water from the Highline canal, store the water in the regulating reservoir, and when needed, pump the water back to the Highline canal or Lateral 7 supplement existing flows.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
Turlock Irrigation District TID Lateral 8 Regulating Reservoir Expansion Project Addendum
Turlock Irrigation District Lateral 8 Regulating Reservoir Expansion Project
Turlock Irrigation District Lateral 8 Regulating Reservoir Expansion Project