SCH Number 2015101062
Project Info
- Title
- Lateral 8 Regulating Reservoir Expansion Project
- Description
- TID proposes to expand the size of its existing Lateral 8 Regulating Reservoir facility to utilize the entire extent of the parcel on which it is located, to increase storage capacity of the existing surface water storage/regulation facility. As part of the expansion, two additional pumps will be installed at the existing pump facility. As with the existing regulating reservoir facility, the expanded regulating reservoir will receive water from the Highline canal, store the water in the regulating reservoir, and when needed, pump the water back to the Highline canal or Lateral 7 supplement existing flows.
3 documents in project