SCH Number 2015081071


Project Info

Title
Harmony Grove Village South (Recirculation of the EIR)
Description
HARMONY GROVE VILLAGE SOUTH PROJECT (PDS2015-GPA-15-002), (PDS2015-SP-15-002), (PDS2015-REZ-15-003), (PDS2018-TM-5626), (PDS2015-MUP-15-008), (PDS2018-STP-18-011), (PDSXXXX-HLP-XXX); LOG NO. PDS2015-ER-15-08-006; SCH# 2015081071. The Harmony Grove Village South Project (project) is a master-planned community within the San Dieguito community plan area within the unincorporated area of San Diego County. The project proposes 453 dwelling units at an overall density of 4.08 dwelling units per acre; a 5,000 square foot (sf) community clubhouse building with 1,500 sf of public commercial space; public and private parks, two miles of trails and pathways, and 35 acres of dedicated biological open space. The Project will provide, as a condition of approval, an affordable housing component that will include 10 percent of the project’s total dwelling units as on-site affordable housing (as defined by California Health and Safety Code Section 50052.5 and 50053). Recirculation of portions of the 2018 FEIR The 2018 FEIR was certified, and the Project was approved by the County Board of Supervisors on July 25, 2018, in accordance with the California Environmental Quality Act (CEQA), along with Appendix J, Final Greenhouse Gas Analyses Report (HELIX Environmental Planning, 2018), augmented by the Global Climate Change Supplemental Letter prepared by Ldn Consulting, Inc. (February 16, 2018). Following County approval and certification of the 2018 FEIR, the Project was challenged in two CEQA actions. Following litigation and appeal, the California Court of Appeal (Court) found that the 2018 FEIR was adequate in all respects except for one: the GHG mitigation measures relative to credit purchase (location, registry confirmation, and approval by the Director of PDS. As a result of the litigation, the project has revised its GHG mitigation measure detailed in both Section 2.7 (Climate Change) and the 2024 Global Climate Change Report, both of which are part of the New Recirculated Section with Attachments and this public disclosure. In addition to the new mitigation measure, textual updates were made as appropriate to Section 2.7, Project Design Features were revised/augmented, and emissions modeling updates were completed. All other issues have been fully resolved by litigation and, as such, are not subject to further examination and the conclusion as to CEQA significance (significant and mitigable) to the 2018 FEIR remain the same. The County requests that reviewers limit the scope of their comments to the New Recirculated Section with Attachments. For a complete discussion of the rationale for recirculation and guidance for commenters, refer to the “Readers Guide to Additional Information for Harmony Grove Village South added to Section 2.7 of the Final EIR and the Affordable Housing Condition” included at the beginning of the New Recirculated Section with Attachments. Project Website: https://www.sandiegocounty.gov/content/sdc/pds/Current_Projects/hgvs.html
Download CSV New Search

 

5 documents in project

Type Lead/Public Agency Received Title
San Diego County Harmony Grove Village South (Recirculation of the EIR)
San Diego County Harmony Grove Village South
San Diego County Harmony Grove Village South (HGVS)
San Diego County Harmony Grove Village South (HGVS)
San Diego County Harmony Grove Village South