SCH Number 2015072001
Project Info
- Title
- Main Gate Road and "C" Street Project (a.k.a. Hamilton Square)
- Description
- Phase 1 The Applicant is proposing to remove approx. 2,800 cubic yards of contaminated soil over a period of 6-days. The contaminated soil would be sent to facilities certified to dispose of such material. The excavation pits would be filled with clean soil and re-compacted, a process requiring an additional week's time to complete. A post-remediation human health risk assessment, including soil, soil vapor, and ground water testing would be conducted to determine if conditions at the Project site meet residential environmental screening levels established by the SF Bay RWQCB. Phase 2 The Applicant is proposing to develop the site with 31 townhome-style residential units with tuck-under parking in 8 three-story buildings and 1 two0story building. The maximum building height proposed is 34 feet. Six three story buildings are proposed that would surround and face a common park area, two three-story buildings with frontage on "C" Street, and one two-story building with frontage on Main Gate Road. the following is a listing of residential project components: 21 three-bedroom and 10-four bedroom townhomes. Unit sizes range from 1,387 to 1,929 sq. ft. A large central common park space for social gatherings and recreation among residents. A mail pavilion and entry green on the project site adjacent to the sidewalk on Main Gate Road. Front yards, upper-story balconies, and landscaped areas distributed throughout the project site. 3 vehicular entry points connecting to an internal drive aisle network within the Project Site. Two access points are located on C Street. The third vehicular access point is a right-in/right-out driveway located on Main Gate Road.
3 documents in project