SCH Number 2015062075


Project Info

Title
Woodland Flood Risk Management Project
Description
The City has partnered with DWR to identify and implement a flood risk reduction project to meet the state's urban level of flood protection requirements in a cost-effective manner. The Proposed Project has been formulated to be compatible with alternatives currently being evaluated by the U.S. Army Corps of Engineers as part of the ongoing Lower Cache Creek Feasibility Study. Project improvements include installation of an approximately 5.5-mile-long earthen levee and a drainage channel along Woodland's northern boundary to redirect overland flood flows to the Cache Creek Settling Basin (CCSB) and the City's North Drainage canal; installation of an inlet weir in the existing CCSB west levee to allow flood flow conveyance into the CCSB; improvements to strengthen the CCSB west and south levees; degradation of 3,000 feet of the CCSB training levee to improve sediment distribution within the CCSB; and construction of elevated crossings or closures where the proposed levee crosses existing roads or railroad tracks, and installation of culverts at road and railroad crossings for flood flow conveyance in the proposed drainage channel.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
City of Woodland Woodland Flood Risk Management Project
City of Woodland Woodland Flood Risk Management Project
City of Woodland Woodland Flood Risk Management Project