SCH Number 2015058179


Project Info

Title
Sorrento Mesa Recycled Water Pipeline
Description
Project will install approx. 1.25 miles of 8 inch polyvinyl chloride (PVC) water pipeline resulting in expansion of the recycled water pipeline system allowing high water demand customers to convert their irrigation and water cooling needs from potable water system to recycled water. The Project is estimated to offset 200 acre-feet per year of water use from the potable water system to recycled water reducing the City's imported water quantities. Installation of the recycled water pipeline would occur via the open trench method of construction requiring a trench depth of 3-5 feet and trench width of 3-5 feet. Additional improvemetns will include installation of recycled water laterals, curb ramps, and other appurtenances; and street repair and/or resurfacing. Potholing is also required to verify the reconnection of water laterals to mains and/or to verify utility crossings.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of San Diego Sorrento Mesa Recycled Water Pipeline
City of San Diego Sorrento Mesa Recycled Water Pipeline