SCH Number 2015032009
Project Info
- Title
- Hazal Valley Road at El Dorado Canal Bridge (25C0092) Replacement Project
- Description
- The proposed replacement will be an approximately 54 foot long, 28 foot wide concrete slab bridge. The bridge will be installed on concrete abutments with cast in drilled hole (CIDH) piles. Concrete bridge rails are proposed. The new bridge will meet the AASHTO minimum standards for a "Resource Recovery Road" or a "Minor Access Road" (AASHTO 2001).
2 documents in project