SCH Number 2015011022
Project Info
- Title
- Well No. 17
- Description
- Installing vertical turbine pump and associated facilities for existing well drilled in 2005,but never equipped for production. Improvements will include an estimated 2000 GPM, 150 HP pump with associated discharge piping & valving, Manganese greensand treatment system, electrical and chlorination equipment, electrical service including meter and transformer, estimated 250 KW emergency power generator, SCADA controls, site security, connection for future telephone line/alarm dialer, HVAC, site grading & lighting, storm drain collection, perimeter fencing, & paved surface.
2 documents in project