SCH Number 2014082024


Project Info

Title
Clay Street Bridge (25C-0117) Replacement Project
Description
The proposed Clay Street Bridge Replacement Project (proposed project) improvements would consist of replacing the existing Clay Street Bridge with a two-lane bridge, requiring the realignment of Clay Street to form a new four-way intersection with Main Street and Cedar Ravine Road. The bridge replacement and roadway realignment would include lane configurations and striping, and pedestrian and bicycle accommodations. Improvements would include curb ramps and crosswalks on all four legs of the intersection that would be designed to meet ADA requirements and allow for improved mobility in the area. The proposed project would extend the sidewalk south along Cedar Ravine Road to fill in the existing gap in the sidewalk network on the east side of Cedar Ravine Road between Main Street and Pacific Street. Main Street and Clay Street would be marked with Class III bicycle facilities. This proposed project is included in the 2019 Federal Statewide Transportation Improvement Program (FSTIP) as well as the Sacramento Area Council of Governments (SACOG) 2021-2024 Metropolitan Transportation Improvement Program.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
City of Placerville Clay Street Bridge (25C-0117) Replacement Project
City of Placerville Clay Street Bridge Replacement and Realignment Project
City of Placerville Clay Street Bridge Replacement and Realignment Project