SCH Number 2014062058
Project Info
- Title
- Songbird 10 Million Gallon Water Tank
- Description
- PCWA is proposing to acquire a site for the construction and operation of a water storage tank. The project would consist of acquisition of the property, design and construction of a 10 mg water storage tank, and associated facilities (fencing, permanent access road, altitude valve station, drainage/overflow features, and utilities into the facility).
2 documents in project