SCH Number 2014022010
Project Info
- Title
- Yuba Goldfields 100-Year Flood Protection Project
- Description
- To enlarge and reshape existing dredge tailing embankments in the Goldfields that are designed to intercept and block 100-yr breach flows originating from the South Bank dredge tailings embankment along the Yuba River.
3 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | Three Rivers Levee Improvement Authority | Yuba Goldfields 100-Year Flood Protection Project | |
NOD | Three Rivers Levee Improvement Authority | Yuba Goldfields 100-Year Flood Protection Project | |
MND | Three Rivers Levee Improvement Authority | Yuba Goldfields 100-Year Flood Protection Project |