SCH Number 2013112071
Project Info
- Title
- Alder Drive at EID Canal - Bridge Replacement (No. 25C0069)
- Description
- The purpose of the Project is to replace the functionally obsolete Alder Drive Bridge over the EID Canal with a culvert that meets current design standards. The Project involves replacing the existing 32-foot-long, 18-foot-wide, 2-lane reinforced concrete slab bridge with a double-barrel culvert (two 36-inch or equivalent size circular culverts) that meets current design standards. The proposed culvert would tie in with the existing 30-foot-wide roadway providing two 12-foot traffic lanes and 3-foot shoulders on each side of the roadway. The proposed culvert would be located at the existing bridge location. All widening would occur along the eastern side of the existing roadway.
2 documents in project