SCH Number 2013102032
Project Info
- Title
- Santa Cruz 115-kV Reinforcement Project
- Description
- The proposed project includes converting an existing 7.1 miles of single-circuit, 115-kV power line into a double-circuit, 115-kV power line by replacing existing wood poles with tubular steel poles (TSPs); construction a new, approximately 1.7-mile-long, single-circuit, 115-kV power line on new TSPs and new wood poles along the existing distribution alignment; and, modifying the Rob Roy Substation and existing power lines into the substation to accommodate the new circuit.
2 documents in project