SCH Number 2013071020
Project Info
- Title
- Santa Ana Canyon - Below Prado Inland Empire Brine Line Protection
- Description
- The Project consists of the installation of approximately 2,500 LF of AZ28-700 sheet pile, having a width of approximately two feet and an average toe depth of 55 feet (15 feet below the scour depth), with tiebacks spaced approximately every 10 feet. Construction will occur in two different locations along the existing Santa Ana River (SAR) Trail. The easternmost portion (near Prado Dam), will extend approximately 2,300 linear feet. The westernmost portion of the outlet to Aliso Canyon, will extend approximately 200 linear feet.
2 documents in project