SCH Number 2013032076
Project Info
- Title
- Four Seasons Tank and Woodhill-Woodview Waterline Improvement Project
- Description
- The proposed project includes replacing an existing small diameter (4-inch and 6-inch) underground water line from the existing Four Seasons water tank to the Tahoe Woods Subdivision with 1,619 feet of 12-inch diameter PVC piping. The proposed project also includes installing approximately 491 feet of 12-inch PVC waterline between the ends of Woodhill Court and Woodview Court to connect two dead-end waterlines that exist at the end of each cul-de-sac.
2 documents in project