SCH Number 2013021059
Project Info
- Title
- 001B Turn-out Structure Project
- Description
- The 001B Turn-out Structure Project (proposed project) consists of a reinforce concrete turn-out structure with a connection to the existing recycled water pipeline (RWP). The concrete turn-out structure may be equipped with values or slide gates for diverting recycled water from the RWP into through a discharge pipeline into the permeable area of the San Gabriel River (SGR) for recharge. The discharge pipeline would extend through the levee and discharge at the surface level of the channel of the SGR. A concrete apron and riprap would be constructed to prevent erosion of the channel bottom.
2 documents in project