SCH Number 2013021012
Project Info
- Title
- Landfill Gas Collection and Control System
- Description
- The project will consist of an enclosed gas flare to burn methane generated at the landfill [80-400 standard cubic feet per minute (scfm) at 50-percent methane] and a gas well and collection system. The gas flare facility will measure six feet in diameter by twenty four (24) feet tall. A propane source will be used for a pilot flame to ignite the Landfill Gas (LFG) that is introduced to the flare. The gas extraction and flare system will be operated continuously to minimize LFG leaks, except during unanticipated shutdowns or for maintenance and repair activities.
2 documents in project